Dedicated Business Fibre
Fibre connectivity designed around the demands of your site.
For locations that need stronger upload performance, greater capacity and higher-grade service options, MedicCom can deliver a tailored fibre service using Telstra or nbn infrastructure.

Symmetrical speed options
Higher-capacity bandwidth
Telstra and nbn fibre networks
Business service-assurance options
Designed and quoted for the address
Two access networks
One fibre outcome. Two ways to deliver it.
MedicCom can deliver dedicated business fibre using Telstra or nbn infrastructure. The appropriate network depends on what is available at the address and what the site requires.
The appropriate network depends on the site.
MedicCom compares network availability, bandwidth, build costs, delivery time, service assurance and resilience requirements before preparing a recommendation.
When Business NBN isn’t enough
For sites where the connection has become infrastructure.
Dedicated business fibre is designed for locations where cloud applications, communications and large data transfers place greater demands on the connection.
Greater upload capacity
Symmetrical speed options can support cloud backups, large file transfers, DICOM images and communication between locations.
Higher-grade service options
Select service-assurance and restoration options according to the operational importance of the site.
Capacity that can scale
Choose bandwidth around current workloads while allowing for future applications, staff and connected systems.
Multiple concurrent cloud, voice and video users
VPNs connecting sites and remote systems
Critical phones, EFTPOS and hosted applications
Large backup, imaging or data-transfer workloads
Common questions
What businesses usually want to know before choosing fibre.
Straight answers to the practical questions that come up when planning a dedicated business fibre service.
How is dedicated fibre different from Business NBN?
Dedicated fibre can provide symmetrical speeds, greater capacity and higher-grade service-assurance options. The service is designed and quoted specifically for the address.
Is dedicated fibre available at every address?
Not necessarily. Availability, construction requirements and installation costs depend on the Telstra or nbn infrastructure serving the location.
How long does installation take?
Dedicated fibre installation generally takes between 8 and 12 weeks, depending on the selected network, site requirements and whether additional fibre construction is required.
Can fibre support multiple sites or a backup connection?
Yes. Dedicated fibre can form part of a multi-site, private-network or resilient connectivity design, with a separate backup service where required.